又湿又紧又大又爽a视频国产,亚洲国产精品一区二区久久hs,亚洲中文字幕日产乱码高清app,欧美性猛交xxxx富婆,人人妻人人澡人人爽欧美一区九九,色偷偷av一区二区三区,久久久精品人妻一区二区三区蜜桃,精品丝袜人妻久久久久久,亚洲国产中文在线二区三区免,精品人妻一区二区三区四区

        濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
        新聞
        聯(lián)系我們
        咨詢電話
        15866735826

        聯(lián)系:張經(jīng)理

        手機(jī): 15866735826

        郵箱: 394441862@qq.com

        網(wǎng)址:http://www.7x24taxi.net/

        地址:山東省濟(jì)南市章丘圣井工業(yè)園

        當(dāng)前位置: 首頁 > 新聞中心 > 常見問題

        在加工棚拆除前須進(jìn)行技術(shù)交底!

        來源:http://www.7x24taxi.net/   發(fā)布時(shí)間:2023-02-20

        在施工過程中搭建木工加工棚一定要注意做好防護(hù)措施,施工人員一定要按照施工要求進(jìn)行施工。露天的攪拌機(jī)位置,現(xiàn)場混凝土攪拌機(jī)、卷揚(yáng)機(jī)棚、鋼筋棚、木工棚以及一些出入口,現(xiàn)場廁所需要等都需要搭設(shè)木工加工棚。由于建筑使用的木工加工棚增多,使得很多廠家都可以制作木工加工棚。
        During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Due to the increase of woodworking sheds used in buildings, many manufacturers can make woodworking sheds.
        木工加工棚在建筑工地上是保護(hù)建筑施工材料的堆放、為了防止工地物品不受雨水淋濕導(dǎo)致生銹。 木工加工棚搭設(shè)完畢后,須經(jīng)過專職員驗(yàn)收合格,方可投入使用。在加工棚搭設(shè)和拆除前,須進(jìn)行技術(shù)交底。
        The carpentry processing shed is used to protect the stacking of construction materials on the construction site, and to prevent the rusting of site items from being soaked by rain. After the carpentry processing shed is erected, it can only be put into use after passing the acceptance of the full-time safety officer. Before the erection and removal of the processing shed, safety technical disclosure must be carried out.
        高處作業(yè)人員須經(jīng)過技術(shù)培訓(xùn)及考試合格,持證上崗。木工加工棚采用的鋼管、扣件等材料須符合技術(shù)規(guī)范及有關(guān)標(biāo)準(zhǔn)要求。搭設(shè)和拆除水平木工加工棚時(shí),操作工人的“三寶”須齊備,且應(yīng)正確使用。
        High-altitude operators must receive professional technical training and pass the professional examination, and work with certificates. The steel pipes, fasteners and other materials used in the woodworking shed must meet the requirements of safety technical specifications and relevant standards. When erecting and dismantling the horizontal woodworking processing shed, the operators' "three treasures of safety" must be complete and used correctly.
        木工加工棚
        在木工加工棚搭拆時(shí),應(yīng)避免上下同時(shí)作業(yè),把操作時(shí)間錯(cuò)開。搭拆木工加工棚時(shí),所有材料、工具應(yīng)堆放在建筑物外邊線以內(nèi)少2m,堆碼高度不超過1m。拆除的材料須傳遞到樓層內(nèi)并及時(shí)運(yùn)走,嚴(yán)禁高空拋擲。搭拆木工加工棚時(shí),應(yīng)在地面設(shè)置警戒區(qū),并派專人監(jiān)護(hù)。
        When erecting and dismantling the woodworking shed, it is necessary to avoid working up and down at the same time and stagger the operation time. When erecting and dismantling the woodworking processing shed, all materials and tools shall be stacked at least 2m within the outer boundary of the building, and the stacking height shall not exceed 1m. The removed materials must be transferred to the floor and transported away in time. Throwing from high altitude is strictly prohibited. When erecting and dismantling the woodworking processing shed, a warning area should be set on the ground and a special person should be assigned to monitor it.
        木工加工棚搭拆時(shí),要有專人指揮。管理人員要做到:眼勤、腿勤、嘴勤,對危險(xiǎn)情況要積極采取有效防護(hù)措施,確保人員。雨天、大風(fēng)天氣,暫停木工加工棚搭拆施工,并應(yīng)檢查維護(hù)木工加工棚的。
        When erecting and dismantling the woodworking shed, a special person shall be assigned to command. The management personnel shall be diligent in eyes, legs and mouth, and actively take effective safety protection measures for dangerous situations to ensure personnel safety. In rainy and windy weather, the erection and dismantling of woodworking processing shed shall be suspended, and the safety of woodworking processing shed shall be checked and maintained.
        在施工過程中搭建木工加工棚一定要注意做好防護(hù)措施,施工人員一定要按照施工要求進(jìn)行施工。露天的攪拌機(jī)位置,現(xiàn)場混凝土攪拌機(jī)、卷揚(yáng)機(jī)棚、鋼筋棚、木工棚以及一些出入口,現(xiàn)場廁所需要等都需要搭設(shè)木工加工棚。您有需求就來我們網(wǎng)站http://www.7x24taxi.net咨詢吧!
        During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Come to our website if you need http://www.7x24taxi.net Ask!

        最新免费国产中文无码黄色网站| 欧洲多毛裸体xxxxx| 久一视频在线| 久久精品国产亚洲av瑜伽| 超碰97久久国产精品牛牛| 亚洲av丰满熟妇在线播放| 久久久久人妻一区精品性色av| 7m精品福利视频导航| 污污内射久久一区二区欧美日韩| 午夜天堂精品久久久久| 亚洲日韩国产AV无码无码精品| 欧美激情视频一区二区三区免费| 国内精品久久久久伊人av| 久久久久亚洲av无码麻豆| 亚洲AV无码兔费综合| 色欲AV无码精品一区二区久久| 国产午夜成人精品视频APP| 成年女人黄小视频| 精品中文字幕一区二区三区四区| 久久亚洲国产高清| а天堂中文地址在线| 成人无码午夜在线观看| 国产亚洲情侣一区二区无| 日本一区二区三区免费播放| 99国产精品久久久久久久成人热| 成年丰满熟妇午夜免费视频| 粉嫩小泬无遮挡久久久久久| 办公室少妇愉情理伦片| 《年轻女教师2》中文字幕| 99久E在线精品视频在线| 久久免费香蕉视频| 国产网爆门视频在线播放| 亚洲人成综合网站7777香蕉| 婷婷射精av这里只有精品| 亚洲欧洲∨国产一区二区三区| 精品国产性色无码av网站| 精品国产精品国产偷麻豆| 亚洲 欧美 综合 另类 中字| 国产成人精品一区二区三区无古代| 久久99国产精品久久99| 久久亚洲色一区二区三区|